Designers' Manual
A Complete Guide

Table of Contents and Document Revision Dates
Administrative Procedures
Chapters
-
Chapter 1: Introduction
-
Chapter 2: Designer Agreements and Payments
-
Chapter 3: Design
-
Chapter 4: Project Manual Guide
-
Chapter 5: Procurement
-
Chapter 6: Construction
-
Chapter 7: Closeout and Record Documents
Appendix 1: Administrative Forms for Design Services
-
SBC-6 Owner / Designer Agreement
-
SBC-6a Terms and Conditions for Owner / Designer Agreement
-
SBC-6s Supplemental Owner / Designer Agreement
-
Attestation for Personnel
Appendix 2: Tennessee High Performance Building Requirements
- Tennessee High Performance Building Requirements Manual
- High Performance Building Requirements (HPBr) are located at the following web address under the Technical Standards tab: https://www.tn.gov/osa/article/osa-capital-projects
-
Sustainable Design Guidelines - December 2012 (superceded)
-
SDG Checklist and Calculators - July 2012 (superceded)
Appendix 3: General Design Guidelines
Administrative Forms
-
F 388 Designer's Cost Estimate
-
F 475 Project Manual Front-End Review Checklist
-
F 486 Stormwater Review Plan Checklist
-
F 490 Bid Documents Submittal Form
-
F 517 Plan Rooms
-
F 545 Map of Bidding Regions
-
F 551 Bidder Licensing Expectations Report
-
F 555 Bid Tab
-
F 566 Designer Evaluation for Design Phase
-
F 612 Pre-Construction Conference Discussion Guide
-
F 615 Pre-Construction Data Sheet
-
F 632 Field Report
-
F 637 Commissioning Progress Observation
-
F 641 Action Item Log
-
F 642 Request for Information Log
-
F 643 Minor Orders Log
-
F 644 Request for Proposal Log
-
F 654 Request for Proposal
-
F 656 Supplemental Instruction
-
F 657 Supplemental Drawing
-
F 664 Proposal Recommendation
-
F 686 Stormwater Site Audit Checklist
-
F 691 Property Report T-100
-
F 695 Closeout Checklist
-
F 704 Certificate of Substantial Completion
-
F 723 Storm Water As-Built Certification
-
F 754 Project Data Binder Transmittal
-
F 764 Report of Final Inspection
-
F 780 Advertisement of Final Payment
-
F 825 Project Information Data Form (Substitute SBC-25)
-
F 866 Contractor Evaluation after Construction
-
F 966 Designer Evaluation after Construction
-
F 984 Report of One-Year Corrective Inspection
Bidding & Contracting Requirements
-
00 11 16 Invitation to Bid
-
00 11 19 Request for GMP
-
00 11 66 Invitation to Bid (Non-Construction)
-
00 21 13 Instructions to Bidders
-
00 21 19 Instructions to CM/GC for Producing the GMP
-
00 21 63 Instructions to Bidders (Non-Construction)
-
00 22 16 Supplementary Instructions to Proposers
-
00 22 20C Map to bid opening location in Chattanooga
-
00 22 20J Map to the Bid Opening Location in Jackson
-
00 22 20K Map to bid opening location in Knoxville
-
00 22 20M Map to bid opening location in Memphis
-
00 22 20N Map to the Bid Opening Location in Nashville
-
00 22 20T Map to bid opening location in Tri-Cities
-
00 31 26 Asbestos Survey Information Available to Bidders
-
00 31 32 Geotechnical Information Available to Bidders
-
00 36 66 Owner's System Office Access
-
00 38 60 Disqualified Contractors and Subcontractors
-
00 41 13 Bid Form
-
00 41 63 Bid and Agreement Form (Non-Construction)
-
00 42 23 GMP Summary
-
00 42 71 GMP List of Trade Subcontracts
-
00 42 75 GMP Disclosure of General Conditions
-
00 47 13 Construction Bid Envelope
-
00 47 63 Non-Construction Bid Envelope
-
00 52 13 Agreement (General Work)
-
00 54 33 ACH Form
-
00 61 13 Contract Bond
-
00 61 43 Three Year Roof Bond
-
00 72 03 General Conditions marker for AIA A201
-
00 72 13 General Conditions (General Work, modified A201)
-
00 72 63 General Conditions (Non-Construction)
-
00 73 16 Supplementary Conditions
-
00 73 43 Supplementary Conditions : State Wages
-
00 73 45 Supplementary Conditions : Federal Wages
Specifications
-
01 21 13 Allowances
-
01 21 15 List of Allowances
-
01 22 13 Unit Prices
-
01 22 15 List of Unit Prices
-
01 23 00 Alternates
-
01 25 13 Product Substitution Procedures
-
01 25 33 Product Substitution Request Form
-
01 26 00 Contract Modification Procedures
-
01 26 20 Weather Delays
-
01 26 25 Weather Delay Report
-
01 26 40 Form for Amendment, Change Order, or Directive
-
01 26 54 Form for Price Summary
-
01 26 55 Form for Price of Work
-
01 26 56 Form for Price of Time
-
01 29 16 CM/GC-GMP Contingency and Reserve
-
01 29 17 CM/GC-GMP Contingency Log
-
01 29 18 Form for CM/GC GMP Reserve Fund Log
-
01 29 54 Retainage Escrow Initiation
-
01 29 73 Schedule of Values
-
01 29 76 Applications and Certificates for Payment
-
01 31 19 Project Meetings
-
01 31 90 Administrative Logs
-
01 31 93 Visitor Log
-
01 32 15 Progress Schedules and Reports
-
01 41 15 Basic Regulatory Requirements
-
01 43 25 Testing Laboratory Services
-
01 52 25 Owner's Field Office
-
01 57 23 Temporary Storm Water Pollution Control
-
01 62 25 Product Options
-
01 77 70 Closeout Procedures
-
01 78 21 Closeout Submittals (basic)
-
01 78 21E Closeout Submittals (detailed Example)
-
01 78 25 Data Binder Receipt
-
01 78 88 Report of Subcontractors and Suppliers
-
01 79 21 Demonstration and Training
-
01 79 25 Demonstration and Training Verification
-
01 91 13 Commissioning
-
01 91 23 Performance Testing Identification Form
-
01 91 26 Performance Testing Procedures Form
-
01 91 29 Functional Performance Test Certification
-
07 50 35 Total Roofing System Warranty Instructions
-
07 50 36 Total Roofing System Warranty
-
23 08 00 Mechanical & Control Systems Commissioning
-
23 08 13 Sensor Point Calibration Check Sheet
-
23 08 16 Terminal Box Point Calibration Check Sheet
-
26 08 00 Electrical & Lighting Systems Commissioning
-
26 08 06 Panelboard Check Sheet
-
26 08 13 Power Circuit Check Sheet
-
26 08 30 Generator Testing Procedures Form
-
26 08 32 Generator Testing Findings Form
-
26 08 50 Lighting Check Sheet